Product Detail :
|
The project involves the design, supply, installation, testing, and commissioning of traction substations connected in a Scott/V configuration, along with associated switching posts. This is part of the upgrade of the electric traction system from a single-phase 25 KV to a dual-phase 25 KV system to support a loading target of 3000 MT in the Kumandih-Garhwa section. Traction Sub Stations, Switching Posts, SCADA system
|
| Tender Detail : |
The project involves the design, supply, installation, testing, and commissioning of traction substations connected in a Scott/V configuration, along with associated switching posts. This is part of the upgrade of the electric traction system from a single-phase 25 KV to a dual-phase 25 KV system to support a loading target of 3000 MT in the Kumandih-Garhwa section. |